California Hospital Tower Project Final EIR

California Hospital Tower Project Final Environmental Impact Report (EIR)

UC Davis prepared a Final Environmental Impact Report (EIR) in accordance with the requirements of the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and other applicable laws for the UC Davis Sacramento Campus California Hospital Tower Project.

The Final EIR consists of three volumes: Volume 1, California Hospital Tower Project Final EIR, Volume 2, Appendices to the Final EIR, and Volume 3 consists of responses to comments, revisions to the Draft EIR, and the mitigation monitoring and reporting program for the California Hospital Tower Project.

The State Clearinghouse Number assigned for the project is 2021020515.
The Board of Regents reviewed and certified the UC Davis Sacramento Campus California Hospital Tower Project Final EIR on November 18, 2021.

Available Documents:

Subsequent Approvals:

The Parking Structure 5 (PS5) project includes a parking structure at the southwest corner of 48th Street and V Street on the northwest corner of existing Parking Lot 4 at the Sacramento Campus.  The project includes a six-level parking structure with approximately 957 parking stalls along with offices for parking and security personnel and a conference room on the ground floor. Additional information can found on the Current Projects webpage: https://environmentalplanning.ucdavis.edu/current-projects#PS5

The California Tower EIR Addendum #1 discloses information regarding the infeasibility of using only electric cranes during construction of the Project, as previously required in Mitigation Measure AQ-2a. The mitigation measure has been updated to allow for non-electric cranes to be used provided that other construction equipment be electrified to the extent necessary to result in no new or increased environmental impacts. The full language of the updated mitigation can be viewed in the Addendum #1 below.

 

Questions regarding the Final EIR can be addressed to:

Heather Davis, AICP
Interim Director of Environmental Planning
Campus Planning and Environmental Stewardship
University of California, One Shields Avenue
Davis, CA 95616
environreview@ucdavis.edu


Documents

Volume 1 – UC DAVIS SACRAMENTO CAMPUS CALIFORNIA HOSPITAL TOWER FINAL EIR (62MB)

Volume 2 - Appendices (37MB)

Volume 3 - COMMENTS, RESPONSES, MMRP, AND REVISIONS TO THE DRAFT EIR (13MB)