California Hospital Tower Project Final Environmental Impact Report (EIR)
UC Davis prepared a Final Environmental Impact Report (EIR) in accordance with the requirements of the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and other applicable laws for the UC Davis Sacramento Campus California Hospital Tower Project.
The Final EIR consists of three volumes: Volume 1, California Hospital Tower Project Final EIR, Volume 2, Appendices to the Final EIR, and Volume 3 consists of responses to comments, revisions to the Draft EIR, and the mitigation monitoring and reporting program for the California Hospital Tower Project.
The State Clearinghouse Number assigned for the project is 2021020515.
The Board of Regents reviewed and certified the UC Davis Sacramento Campus California Hospital Tower Project Final EIR on November 18, 2021.
Available Documents:
- California Hospital Tower Project Final EIR Findings
- California Hospital Tower Project Final EIR Notice of Determination (NOD)
Subsequent Approvals:
- California Hospital Tower Component of the California Hospital Tower Project
- Parking Structure 5 Component of the California Hospital Tower Project
Questions regarding the Final EIR can be addressed to:
Environmental Planning
Campus Planning and Environmental Stewardship
University of California, One Shields Avenue
Davis, CA 95616
environreview@ucdavis.edu
Documents
Volume 1 – UC DAVIS SACRAMENTO CAMPUS CALIFORNIA HOSPITAL TOWER FINAL EIR (62MB)
- Executive Summary
- 1 INTRODUCTION
- 2 PROJECT DESCRIPTION: CALIFORNIA HOSPITAL TOWER PROJECT
- 3 EXISTING ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION
- 3.0 Introduction to the Analysis
- 3.1 Aesthetics
- 3.2 Air Quality
- 3.3 Biological Resources
- 3.4 Archaeological, Historical, and Tribal Cultural Resources
- 3.5 Energy
- 3.6 Geology, Soils, and Seismicity
- 3.7 Greenhouse Gas Emissions
- 3.8 Hazards and Hazardous Materials
- 3.9 Hydrology and Water Quality
- 3.10 Land Use and Planning
- 3.11 Noise
- 3.12 Population and Housing
- 3.13 Public Services
- 3.14 Recreation
- 3.15 Transportation & Circulation
- 3.16 Utilities and Service Systems
- 4 CUMULATIVE IMPACTS
- 5 OTHER CEQA CONSIDERATIONS
- 6 ALTERNATIVES
- 7 PREPARERS & PERSONS CONSULTED
- 8 REFERENCES CITED
- 9 ACRONYMS AND ABBREVIATIONS
- Appendices Cover
- Appendix A Notice of Preparation
- Appendix B NOP Scoping Comments
- Appendix C UC Davis Heliport Noise Study
- Appendix D UCDH Shadow Study
- Appendix E AQ-GHG Modeling
- Appendix F Health Risk Assessment
- Appendix G ICF 2020 Biological Surveys
- Appendix H Noise Modeling
- Appendix I Alternatives Screening
- Appendix J Interchange Ramp Volumes
Volume 3 - COMMENTS, RESPONSES, MMRP, AND REVISIONS TO THE DRAFT EIR (13MB)